test text
85%

SpineArch Neck Rest S Curve Pillow (14x24x4) This Price Applicable only on 30 Pc. MOQ

Original price was: ₹3,999.00.Current price is: ₹608.00.

Availability: 600 in stock

SKU: SAP-SCURVE-2025-02 Category:

SpineArch Neck Rest S Curve Pillow (Queen Size 14x24x4)

Product Specifications: SAP-SCURVE-2025-02

  • Dimensions: 350 mm x 600 mm x 100 mm (S1) x 70 mm (S2)
  • Dimensions: 14x24x4Ā (in)
  • Weight: 1000 Gms.
  • Production Capacity per day: 100 Pieces
  • White Labeling: Available for bulk orders (MOQ: 250 Pieces)

Product Description: The Neck Rest S Curve Pillow (Universal Size) is ergonomically designed to follow the natural ā€œSā€ curvature of the cervical spine, providing optimal neck and shoulder support. Crafted with high-density memory foam and contoured for precise alignment, it ensures a comfortable and restful sleep while helping alleviate neck stiffness and discomfort. Suitable for all sleeping positions, this pillow redefines the standard of orthopedic comfort.

Key Features:

  • Unique S-curve design for enhanced neck and spinal alignment
  • Dual-height contour (100 mm & 70 mm) for customized support
  • High-density memory foam for superior comfort and durability
  • Soft, breathable, and removable outer cover
  • Promotes healthy posture and reduces pressure points

Applications:

  • Ideal for daily use at home for improved sleep quality
  • Beneficial for individuals with neck pain, stiffness, or posture issues
  • Suitable for all sleeping styles – back, side, and stomach sleepers
  • Recommended for orthopedic, wellness, and physiotherapy use
  • Great addition to luxury bedding, spas, and sleep wellness programs.
Weight 1.300 kg
Dimensions 35 × 60 × 10 cm

Reviews

There are no reviews yet.

Be the first to review “SpineArch Neck Rest S Curve Pillow (14x24x4) This Price Applicable only on 30 Pc. MOQ”

Your email address will not be published. Required fields are marked *

Shopping Cart